.. _Installing the Appliance: Installing the Appliance ======================== Before installing the appliance, make sure you have the following: - 3U of server rack space, - at least ten free 1/10 GbE ports in a network switch (10 GbE recommended), - at least ten RJ45-to-RJ45 patch cables to connect the appliance to the switch, - at least six free 1 GbE ports in a network switch for out-of-band management, - two power sockets. To install the appliance, perform the following steps: #. Unpack the appliance. #. Mount the appliance into rack and connect cables. #. Configure the appliance using the wizard. #. Log in to the admin panel and install a license. #. Set up the desired workload in the admin panel. These major steps are described in more detail in the following sections. .. toctree:: :name: 4EbTGxOgM19g1xkN :caption: In this chapter: :maxdepth: 3 unpacking mounting-into-rack connecting-cables configuring