.. _Installing the Appliance: Installing the Appliance ======================== Before installing the appliance, make sure you have the following: - 3U of server rack space in a standard 19-inch cabinet - at least five free 1/10 GbE ports in a network switch (10 GbE recommended) - at least five RJ45-to-RJ45 patch cables to connect the appliance to the switch - two power sockets If you want to set up network bonding, you will additionally need (a) five free 1/10 GbE ports in a network switch (10 GbE recommended) and (b) five RJ45-to-RJ45 patch cables to connect the appliance to the switch. If you want to have access to the nodes from a remote console for out-of-band management, you will additionally need (a) six free 1 GbE ports in a network switch and (b) six RJ45-to-RJ45 patch cables to connect the appliance to the switch. To install the appliance, perform the following steps: #. Unpack the appliance. #. Mount the appliance into rack. #. Connect cables to the appliance. #. Configure the appliance using the wizard. #. Log in to the admin panel and install a license. #. Enable high availability. #. Set up the desired workloads in the admin panel. Steps one through six are described in the following sections. For more information about step seven, refer to the *Administrator's Guide*. .. toctree:: :name: 4EbTGxOgM19g1xkN :caption: In this chapter: :maxdepth: 3 unpacking mounting-into-rack connecting-cables configuring